
Aluminum Composite Panel Production Continuous Machine Line
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Transportation:
- Ocean
- Port:
- Shanghai port or other ports
Your message must be between 20 to 2000 characters
Contact NowSupply Ability: | 20 Set/Sets per Year |
---|---|
Payment Type: | L/C,T/T |
Incoterm: | FOB |
Transportation: | Ocean |
Port: | Shanghai port or other ports |

Aluminum Composite Panel
If you want to know more HONGYANG MACHINERY service , pls send us inquiry without hesitate !
Structural Composition


The Advanced Aluminum Composite Panel Production Line

Conical Twin Screw Extruder

90° Three Roller Calendar Type

45° Three Roller Calendar Type

Two Roller Calendar Type

Three/Two Roller Calendar Combine Type

Stablely Unwinding System

Automatic Electrical Control System

Professional.

Machine Layout.

Sample Project.

HONGYANG MACHINERY | ||
Conventional packaging: inside is wrapped with PE film outside is wooden box. | ||
Delivery. | The normal delivery period is 90 days, depending on the place order time, the specific time is about 90 to 120 days. | |
Details. | We will make detail packing lists even one nut, also make very clear photo for each package. |

Zhangjiagang Hongyang Petrochemical Machinery Co.,Ltd.
1 / Standardized workshop of total 10,000 square meters.
2 / The equipment will be well assembled and test before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
3 / Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.



Hongyang Sales Manager Team and Engineer Team.
1 / Professional installation team who can speak fluent English can help customers make benefits in a shortest time.
2 / The engineers are experienced. We can produce different product with different kinds of requirements and work out reasonable flow chart as per customers' requirements to save space.

Hongyang Machinery Cetificates and Patents.
2 / Verification Certificates of equipments: ISO9001:2015; CE Certificate , TUV
3 / National Certificate of equipment verification:standard organisation of Nigeria , CNCA certificate, Saso certificate of Saudi Arabia, etc.


YOU ARE WELCOME TO OUR FACTORY AT ANY TIME.
● The meaning of visiting supplier, because seeing is believing, Honyang Machinery with own manufacture and developed& research team, we can send you engineers and make sure your after sales service.
HOW TO GUARANTEE YOUR FUNDS TO BE SAFE AND DELIVERY TO BE ON TIME?
● By letter of credit, you can lock the delivery time easily.
● After the factory visit, You can ensure the facticity of our bank account.
SEE HONGYANG MACHINERY HOW TO ENSURE THE QUALITY!
● Each component before assembly needs strictly control by inspecting personnel.
● Each assembly is in charged by a master who has working experience for more than 5 years
●After all the equipment are completed, we will assembling all the machines and run parts testing for at least 12 hours to ensure the stable running in customers' factory
THE AFTER-SALE SERVICE OF HONGYANG MACHINERY!
● After the commissioning, we will package the equipment by standard export package for shipment.
● We will arrange our engineers to customers' factory to do the installation and training.
● Engineers, sales managers and after-sales service manager will form a after-sales team, online and off line, to follow the customers' project.
Related Keywords