Denilco Environmental technology(Suzhou)Co., Ltd.
Denilco Environmental technology(Suzhou)Co., Ltd.
temporary quick dam anti flood barrier board
  • temporary quick dam anti flood barrier board
  • temporary quick dam anti flood barrier board
  • temporary quick dam anti flood barrier board
  • temporary quick dam anti flood barrier board
  • temporary quick dam anti flood barrier board
  • temporary quick dam anti flood barrier board
temporary quick dam anti flood barrier board
temporary quick dam anti flood barrier board
temporary quick dam anti flood barrier board
temporary quick dam anti flood barrier board
temporary quick dam anti flood barrier board
temporary quick dam anti flood barrier board

temporary quick dam anti flood barrier board

Transportation:
Ocean, Land, Air, Express
Port:
Shanghai
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Productivity: 30000pcs per month
Supply Ability: 30000pcs per month
Payment Type: L/C,T/T,D/P,D/A,MoneyGram
Incoterm: FOB,CFR,CIF,EXW
Certificate: ISO9001
HS Code: 3926909090
Transportation: Ocean,Land,Air,Express
Port: Shanghai
Product Description
Product Description

channel cleanout temporary barrier flood control board for river maintenance



What is Temporary Anti-flooding barrier and how to use the flood barrier?
A Temporary Anti-flooding barrier is a device used to prevent flooding in an area. It is a temporary solution that can be quickly deployed in the event of a flood. The freestanding flood barrier is made of materials such as sandbags, water-filled barriers or inflatable barriers.

To use a Temporary Anti-flooding barrier, please follow these steps:

1. Determine the area that needs to be protected from flooding.
2. Choose the type of barrier that could best suit the situation.
3. Install the barrier according to the manufacturer's instructions.
4. Ensure that the barrier is firmly in place and there are no gaps or leaks.
5. Monitor the barrier regularly during the flood to ensure that it is still effective.
6. Remove the temporary flood barrier once the flood has subsided.

It is important to note that a Temporary flood control barrier is not a permanent solution and should not be relied on as the only means of flood protection. It is also important to have a plan in place for evacuation in the event of the severe flood.



model  DZ50 freestanding flood boxwall barrier
size 70.5cm width 68cm depth 52.8cm height
weight 3.8KG±5%/PCS
material ABS
average thickness 5mm±5%
package 700 pcs 20GP, 1500 pcs 40GP
product display

 channel cleanout temporary barrier flood control board for river maintenance

product feature

 channel cleanout temporary barrier flood control board for river maintenance


product application

 channel cleanout temporary barrier flood control board for river maintenance

About us

 channel cleanout temporary barrier flood control board for river maintenance

Packaging & Shipping

 channel cleanout temporary barrier flood control board for river maintenance

FAQ

 channel cleanout temporary barrier flood control board for river maintenance



Q1. What is your terms of packing?
A: Generally, we pack our goods by pallets. For small sample orders, we may pack by woodencase on extra cost.


Q2. What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products
and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 15  working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay for the sample and courier cost.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers' benefit 
  2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.



channel cleanout temporary barrier flood control board for river maintenance

Send your message to this supplier

  • Mr. Meng

  • Enter between 20 to 4,000 characters.