Denilco Environmental technology(Suzhou)Co., Ltd.
Denilco Environmental technology(Suzhou)Co., Ltd.
top quality city road waterlogging solve control barrier
  • top quality city road waterlogging solve control barrier
  • top quality city road waterlogging solve control barrier
  • top quality city road waterlogging solve control barrier
  • top quality city road waterlogging solve control barrier
  • top quality city road waterlogging solve control barrier
  • top quality city road waterlogging solve control barrier
top quality city road waterlogging solve control barrier
top quality city road waterlogging solve control barrier
top quality city road waterlogging solve control barrier
top quality city road waterlogging solve control barrier
top quality city road waterlogging solve control barrier
top quality city road waterlogging solve control barrier

top quality city road waterlogging solve control barrier

Min. Order:
1 Piece/Pieces
Min. Order:
1 Piece/Pieces
Transportation:
Land, Ocean, Air, Express
Port:
Shanghai
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Productivity: 30000pcs per month
Supply Ability: 30000 Piece/Pieces per Month
Payment Type: L/C,T/T
Incoterm: FOB,CFR,CIF,EXW
Certificate: ISO9001
HS Code: 392690
Transportation: Land,Ocean,Air,Express
Port: Shanghai
Product Description
Product Description

door barrier proteccion noaq boxwall contra inundaciones flood barrier

How to solve city waterlogging problem?

1. Improve drainage: One of the most effective ways to solve waterlogging is by improving the drainage system in the area. This can be achieved by installing new drainage systems or improving the existing ones.

2. Create a soakaway: A soakaway is a hole filled with gravel or stones that allows water to drain away slowly. This can be a good solution for areas with a high water table.

3. Raise the ground level: If the area is prone to flooding, raising the ground level can help prevent waterlogging. This can be done by adding soil or other materials to the area.

4. Install a sump pump: A sump pump is a device that can be used to remove water from an area. It can be installed in the basement or other low-lying areas to prevent waterlogging.

5. Plant trees and vegetation: Trees and vegetation can help absorb excess water and prevent waterlogging. This can be a good solution for areas with a lot of rainfall.

6. Create a rain garden: A rain garden is a shallow depression in the ground that is planted with vegetation. It can help absorb excess water and prevent waterlogging.

7. Use permeable paving: Permeable paving is a type of paving that allows water to seep through it. This can be a good solution for areas with a lot of rainfall.

8. Use Flood control barrier or temporary flood boxwall to help divert the water, such as Denilco freestanding flood barrier.

 Easy deploy moveable flood barrier

model DN50 flood control boxwall
size Top width 55 bottom width 22 deep 68cm height 52.8cm
weight 2.4KG±5%/PCS
average thickness 4.2mm±5%

 

product display

 door barrier proteccion noaq boxwall contra inundaciones flood barrier

product feature

 door barrier proteccion noaq boxwall contra inundaciones flood barrier

 

product application

 door barrier proteccion noaq boxwall contra inundaciones flood barrier

About us

 door barrier proteccion noaq boxwall contra inundaciones flood barrier

Packaging & Shipping

 door barrier proteccion noaq boxwall contra inundaciones flood barrier

FAQ

 door barrier proteccion noaq boxwall contra inundaciones flood barrier

 

 

 

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have
legally registered patent, we can pack the goods in your branded boxes after getting your
authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products
and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific
delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds
and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to
pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit 
2. We respect every customer as our friend and we sincerely do business and make
friends with them, no matter where they come from.

door barrier proteccion noaq boxwall contra inundaciones flood barrier

Send your message to this supplier

  • Mr. Meng

  • Enter between 20 to 4,000 characters.