Denilco Environmental technology(Suzhou)Co., Ltd.
Denilco Environmental technology(Suzhou)Co., Ltd.
flood water rainfall overflow control system
  • flood water rainfall overflow control system
  • flood water rainfall overflow control system
  • flood water rainfall overflow control system
flood water rainfall overflow control system
flood water rainfall overflow control system
flood water rainfall overflow control system

flood water rainfall overflow control system

Transportation:
Ocean, Land, Air, Express
Port:
Shanghai
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Productivity: 30000pcs per month
Supply Ability: 10000 Piece/Pieces per Month
Payment Type: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Incoterm: FOB,CFR,CIF,EXW
Certificate: ISO9001, TUV
HS Code: 3920900000
Transportation: Ocean,Land,Air,Express
Port: Shanghai
Product Description
Product Description
Do you know How to control flood water rainfall overflow?
Here we can provide some general information about how to control flood water rainfall overflow:

1. Build retention ponds or basins to collect and store excess water during heavy rainfall. These flood control equipment structures can be designed to slowly release the water back into the environment once the storm has passed.

2. Create green roofs and other permeable surfaces that allow rainwater to be absorbed rather than running off into the streets and drainage systems.
3. Implement rain gardens and bioswales, which are landscaped areas designed to capture and filter rainwater. These features help to reduce the amount of runoff and improve water quality.
4. Install stormwater management systems, such as rain barrels, cisterns, and permeable pavement, to capture and store rainwater for later use.
5. Use ABS plastic flood control barrier and flood control boxwalls or Aluminum flood barrier to control the flow of water and prevent it from overflowing into areas where it can cause damage. The freestanding flood boxwalls are new style of flood control equipment.
6. Maintain and upgrade existing drainage systems to ensure they are functioning properly and can handle the volume of water during heavy rainfall.
7. Develop and enforce land-use policies that limit development in flood-prone areas and require new construction to incorporate stormwater management features.

 

 

Flood barriers anti water flooding prevent flooding of underground loading bays 

 

Product name  Flood barriers anti flooding water
size Top W55cm* H52.8cm*D68mm*W22cm
weight 3.8KG±5%/PCS
average thickness 5mm±5%
Color Red or Customized color
Material   Emgine ABS freestanding flood boxwall
Logo DENILCO or Accepted OEM
Packing  Stretch film /Carton/Pallet or as your request
Sample Provided 
Payment terms T/T, Western Union, PayPal , Cash, Money Gram, Bank Account. etc
product display


 Flood barriers prevent flooding of underground loading bays anti water flooding

product feature

 Flood barriers prevent flooding of underground loading bays anti water flooding

 

product application

 Flood barriers prevent flooding of underground loading bays anti water flooding

About us

 Flood barriers prevent flooding of underground loading bays anti water flooding

Packaging & Shipping

 Flood barriers prevent flooding of underground loading bays anti water flooding

FAQ

 Flood barriers prevent flooding of underground loading bays anti water flooding

 

 

 

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have
legally registered patent, we can pack the goods in your branded boxes after getting your
authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products
and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific
delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds
and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to
pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit 
2. We respect every customer as our friend and we sincerely do business and make
friends with them, no matter where they come from.

Flood barriers prevent flooding of underground loading bays anti water flooding

Send your message to this supplier

  • Mr. Meng

  • Enter between 20 to 4,000 characters.