
OEM hardware custom metal brass stamping parts
- Payment Type:
- L/C, T/T, Western Union
- Incoterm:
- FOB, CFR, CIF, EXW
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 25-30 Days
- Transportation:
- Ocean, Land, Air
- Port:
- Shanghai, Ningbo, China
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | Kunshan,China |
---|---|
Payment Type: | L/C,T/T,Western Union |
Incoterm: | FOB,CFR,CIF,EXW |
Transportation: | Ocean,Land,Air |
Port: | Shanghai,Ningbo,China |
Optimize of mold cost and best use is our priority.
We accept: 2D--dxf & dwg & pdf; 3D--UG files, like STP, IGS, X_T., Prt.
Details:
Specifications
Mold 2D + 3D drawing Design:
Product name |
OEM hardware custom metal brass stamping parts |
Tooling steel material |
Depend on product, we help customer to choose the suitable material. Commonly used material as below: Carbide(CD650,V3,KD20), ASP-23, ASP-60, S55C---45#55, SKD11. |
Steel of mold base |
Depend on product, we help customer to choose the suitable material. Commonly use S45C. |
Mould Standard components |
HASCO, MISUMI, Meusburger, DME, etc. |
Die concept |
2-Plate Die, 3-Plate Die, Module Die |
Mold life |
Depends on the steel material and your requests. Commonly used: 50 Million to 300 Million Times |
Stamping Product |
PC Terminal, Power terminal, Press-Fit Terminal, Lead frame, SIM Spring, Connector Shield, Battery, Metal USB shell, custom stamping. |
Surface finish |
Depends on your requirements. Commonly: Texture Hatching, EDM Hatching, plating, Polishing, Diamoud Polishing, Mirror Polishing and so on. |
Delivery time |
Depends on the size and structure. Normally: 25-30 working days after 50% down payment. |
Terms of payment |
T/T, L/C, Western Union, D/A, D/P, Paypal. |
Machine center |
High speed CNC, Wire cutting, EDM, Grinder, Great Grinder, CNC milling, Drilling and milling, Stamping punching machines, injection machine, Inspection. |
R&D |
1. Drawing design and making for products and mold; 2. Mold drawing revising; 3. Production time and quality control in each machining process. (Our own EPR system). |
Production |
Pilot Run production and molding production can be provided. |
Product Flow
How to Customized a Mold?
A) Before sales Service
- 24hour online consult
- Sample support
- Detailed technical 2d and 3d drawing design
- Free pick up at hotle/aitport to visit Feiya factory
- Qick and profession response on quotation and technial
B) Production period service
- Technical 2d and 3d drawing submit to double check details and discussion
- Quality inspection report submit
- Installation solution and maintenance instruction
C) After sales service
- Provide the usage advice and Guide, remote assistance
- 15 Years quality Guarantee
- Any quality problems replace freely
Our Partner
Our stamping products

Related Keywords