
a2 core coil production line procedure
Your message must be between 20 to 2000 characters
Contact Now
(a) ring A2 Core Coil Production Line Equipment process:
Material preparation + strip - winding annealing - testing 1- dipping paint - baking - testing
2- spraying (outsourcing)- Finishing - testing - packaging
(2) Special A2 Core Coil Production Line process:
Material preparation - strip winding shaping - annealing - stripping detection 1- dipping paint -
Baking test 2→ spraying (outsourcing) - cutting - grinding - finishing test 3- packaging
Main Features
1, High capacity and various thickness from 1mm to 8mm;
2, The thickness range of Aluminum coil covers 0.018mm-0.5mm;
3, Can use recycled PE;
4, Stable technics and easy operation.
Technical paramrter
Model | Max.Panel W*T*V | Machine Size L*W*H | Rated/Run Power(kw) |
ZLFH1300 | 1300/6/1800mm(PM) | 40-45/7.5-8.7/4-5m | 450-500/250-300 |
ZLFH1600 | 1600/6/1800mm(PM) | 40-45/8-9/4-5m | 450-500/250-300 |
ZLFH2000 | 2000/6/1800mm(PM) | 40-45/8.5-9.5/4-5m | 500-550/300-350 |
FAQs
1. Are you a factory or a trading company?
We are a factory, which mainly produces the ACP production line , A2 ACP line, color coating line. Our company has 20 years of production experience. The factory is about 4000 square meters.
2. If my machine can not work when I receive it, what will your factory do?
First of all, do not worry about the thing, we will test the machine before shipment. And if it happened, we will send our engineer to your factory to repair the machine.
3. If my machine is broken within one year, what your factory will do?
Just send us some pictures and our engineer will analysis the reason, and send you broken parts for free.
FAQs
1. Are you a factory or a trading company?
We are a factory, which mainly produces the ACP production line , A2 ACP line, color coating line. Our company has 20 years of production experience. The factory is about 4000 square meters.
2. If my machine can not work when I receive it, what will your factory do?
First of all, do not worry about the thing, we will test the machine before shipment. And if it happened, we will send our engineer to your factory to repair the machine.
3. If my machine is broken within one year, what your factory will do?
Just send us some pictures and our engineer will analysis the reason, and send you broken parts for free.
Related Keywords