
a2 acp line speed line types
Your message must be between 20 to 2000 characters
Contact Now
OVERVIEW
The final product ACP can be widely used in field of construction decoration such as curtain wall,interior and exterior wall of building,ceiling,column,storefront,billboard,exhibition rack,and auto etc.
This production line completes the A-level fire protection
function by changing the non-combustible material into the
non-combustible inorgan-ic core material through a new
production process, and has the function of
integrated forming and automatic continuous production.
Features
1, High capacity and various thickness from 1mm to 8mm;
2, The thickness range of Aluminum coil covers 0.018mm-0.5mm;
3, Can use recycled PE;
Product Classification:2 ACP Line
Technical paramrter
Model | Max.Panel W*T*V | Machine Size L*W*H | Rated/Run Power(kw) |
ZLFH1300 | 1300/6/1800mm(PM) | 40-45/7.5-8.7/4-5m | 450-500/250-300 |
ZLFH1600 | 1600/6/1800mm(PM) | 40-45/8-9/4-5m | 450-500/250-300 |
ZLFH2000 | 2000/6/1800mm(PM) | 40-45/8.5-9.5/4-5m | 500-550/300-350 |
Packaging
FAQs
1. Are you a factory or a trading company?
We are a factory, which mainly produces the ACP production line , A2 ACP line, color coating line. Our company has 20 years of production experience. The factory is about 4000 square meters.
2. If my machine can not work when I receive it, what will your factory do?
First of all, do not worry about the thing, we will test the machine before shipment. And if it happened, we will send our engineer to your factory to repair the machine.
3. If my machine is broken within one year, what your factory will do?
Just send us some pictures and our engineer will analysis the reason, and send you broken parts for free.
FAQs
1. Are you a factory or a trading company?
We are a factory, which mainly produces the ACP production line , A2 ACP line, color coating line. Our company has 20 years of production experience. The factory is about 4000 square meters.
2. If my machine can not work when I receive it, what will your factory do?
First of all, do not worry about the thing, we will test the machine before shipment. And if it happened, we will send our engineer to your factory to repair the machine.
3. If my machine is broken within one year, what your factory will do?
Just send us some pictures and our engineer will analysis the reason, and send you broken parts for free.
Related Keywords