
3d core acp line graph maker
- Payment Type:
- L/C
- Incoterm:
- FOB
Your message must be between 20 to 2000 characters
Contact NowPayment Type: | L/C |
---|---|
Incoterm: | FOB |
OVERVIEW
This design is mainly applied to the coating of medium and high-end coils, double PE, PVDF, efficient and rapid prototyping, coupled with entrance and exit accumulator to ensure continuity of production and change the coils non-stopping. Especially the mature promotion of our double-head coating machine, subversively realizes the need that the paint tray no need to be cleaned during the rapid switching process of the different paints and greatly improves the production efficiency.
Quick Details
Type:3D Core ACP Line
Condition:New
Substrate:Steel
Coating:Powder Coating
Brand Name:Zhonglai
Voltage:380V, 380V 50HZ 3Phase
Power:180KW
Dimension(L*W*H):25M*2.5M*3.5M
Weight:4 KW, 1800kg
Product Classification:3D Core ACP Line
Certification:ISO9001
Warranty:1 Year
Product Description
Features
1, Coating thickness is stable by using rolling coater
2, The paint can be PVDF,PE and AC
3, With multi-module PLC control system
4, Heating and drying system and drying system with natural gas or diesel oil
Technical Parameter
Model | Accumulator | Heating Way | Max..Coil W*T*V | Machine Size L*W*H |
ZLTZ1300 | With | Gas(Electric) | 1300/2.0/30000mm(PM) | 95-105/9-10.5/9-10.5m |
With | Gas(Electric) | 1300/2.0/30000mm(PM) | 95-105/9-10.5/9-10.5m | |
ZLTZ1600 | With | Gas(Electric) | 1600/2.0/30000mm(PM) | 100-105/10-11.5/9-10.5 |
With | Gas(Electric) | 1600/2.0/30000mm(PM) | 95-105/10-11.5/9-10.5 | |
ZLTZ2000 | With | Gas(Electric) | 2000/2.0/30000mm(PM) | 100-110/11-12/9-10.5 |
With | Gas(Electric) | 2000/2.0/30000mm(PM) | 95-110/11-12/9-10.5 |
Packaging
Project Show
FAQ
FAQs
1. Are you a factory or a trading company?
We are a factory, which mainly produces the ACP production line , A2 ACP line, color coating line. Our company has 20 years of production experience. The factory is about 4000 square meters.
2. If my machine can not work when I receive it, what will your factory do?
First of all, do not worry about the thing, we will test the machine before shipment. And if it happened, we will send our engineer to your factory to repair the machine.
3. If my machine is broken within one year, what your factory will do?
Just send us some pictures and our engineer will analysis the reason, and send you broken parts for free.
Related Keywords