
Automatic Filling Beverage Glass Bottling Production line
-
$20000.00≥1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Transportation:
- Ocean, Land
- Port:
- Shanghai
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | jiangsu,china |
---|---|
Productivity: | According to customer requirem |
Supply Ability: | 100 sets per year |
Payment Type: | L/C,T/T |
Incoterm: | FOB,CFR,CIF,EXW,FCA,CPT,CIP |
Certificate: | CE ISO |
Transportation: | Ocean,Land |
Port: | Shanghai |
Rinsing-Filling-Capping 3-in-1 Monoblock
series use unique design, reduce the broken of the bottle, make the whole filling system more stable and high productivity.
Using the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier.
Automatic Bottled Water Production L
Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough..
The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution.
Automatic Bottle Water Filling Line
Beverage Filling Machine
Blowing Filling Capping Combi Block
Any more questions, please feel free to contact us!
FAQ:
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.
Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.
Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.
Related Keywords