
Temporary Stair Tread Protection During Construction
- Payment Type:
- L/C, T/T, Paypal, Money Gram, Western Union
- Incoterm:
- FOB, CIF, EXW
- Min. Order:
- 1600 Others
- Min. Order:
- 1600 Others
- Delivery Time:
- 30 Days
- Transportation:
- Ocean
- Port:
- Shanghai
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 1500rolls / 2 week |
Supply Ability: | 1500rolls / 2 week |
Payment Type: | L/C,T/T,Paypal,Money Gram,Western Union |
Incoterm: | FOB,CIF,EXW |
Certificate: | CCC, ROHS, ISO9001 |
HS Code: | 56039490 |
Transportation: | Ocean |
Port: | Shanghai |
Temporary Stair Tread Protection During Construction
Temporary Stair Tread Protection During Construction is a multifunctional and mechanically resilient nonwoven fleece slightly adherent mat with a breathable protective film for the tougher demands. We adopt tighter dense and thicker nonwoven construction together with liquid-proof foil on top layer. It provides ideal protection to stairs, even under unfavorable conditions.Good adhesion - suitable for stairs; no slipping. The underside of the protective roll adheres to the floor, preventing the mat from slipping.
Product Specification: Temporary Stair Tread Protection During Construction Roll Size: 1m x 25m /roll or 1m x 50m Custom cuts and perforated rolls available
Material: Top with blue surface as liquid barrier. Middle with virginal fiber nonwoven fleece as rebound cushion. Bottom with special self adhesive coating as anti slip safe protection.
Application: Suitable for Protects newly laid floors to enable better evaporation of water (moisture) and Solvents.
Features of Temporary Stair Tread Protection During Construction: 1. Scratch and pressure-resistant 2. Suitable for mopping and vacuum cleaning 3. Does not slip on surface , No fixation with tape 4. Self adhesive coating, No residue on the floor surface 5. Environmentally friendly, Free of harmful substances 6. Impermeable, protects against liquids of any kind (paint, solvents)
Benefits: 1. Save Clean Up Time 2. Create a Safer Workplace 3. Protect Stair Surfaces 4. Tear-proof and durable ,Used several times Cost savings.
Installation: 1. Roll out it with the blue surface side on top and the white, slightly adherent side on the bottom . When laying various rolls next to each other, have the rolls overlap by about 2 inches on each side 2. If there is heavy traffic, the best way to tape down the overlapping part of the rolls.
Installing instructions: 1. Turn off any heat before laying down Temporary Stair Tread Protection During Construction. 2. Protect against direct exposure to sunlight 3. Floor must be dry, even though it is breathable 4. Waiting time for laying down roll 5. Never lay down roll, until the final coat has been applied for 72 hours 6. Ideal room temperature: 0 - 40 C° (32- 104 deg. F) 7. Permissible room humidity: 40-80 % 8. Slightly adherent on the bottom. To avoid accidents, the joints of the mat can be taped down.
|
Related Keywords