
18000BPH Drinking Bottled Water Filling Machine
- Payment Type:
- L/C, T/T
- Incoterm:
- FOB, CFR, CIF
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 30 Days
- Transportation:
- Ocean
- Port:
- Shanghai Port
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | Zhangjiagang City |
---|---|
Productivity: | 2000BPH |
Supply Ability: | 20Sets/Month |
Payment Type: | L/C,T/T |
Incoterm: | FOB,CFR,CIF |
Certificate: | ISO9001, CE |
HS Code: | 8422309090 |
Transportation: | Ocean |
Port: | Shanghai Port |
18000BPH Drinking Bottled Water Filling Machine
Product description
Washing Part:
1). The rotary disk is fully made of SUS304 stainless steel.
2). Using company original tilting bottle clip, bottle clamp stuck bottleneck, avoid the traditional bottle on rubber clip to block the bottle thread parts may be caused by the pollution. Bottle clip is made of SUS304 stainless steel, health and durable.
3). Using imported special efficient spray nozzle, the washing water will be sprayed in a particular angle, can wash any part of the inner wall, rinse with water thoroughly and save flush bottle.
4). Bottle clamp and lifting mechanism of sliding sleeve adopts Germany Igus corrosion resistant bearing without maintenance.
5). Washing part moves by a frame in the transmission system through the gear transmission.
Filling part:
1). The washing bottle, filling, sealing are connecting with the thumbwheel card bottleneck transportation methods.
2). The rotating disk is all made of SUS304 stainless.
3). Filling method is gravity filling.
4). Filling valve manufactured by SUS304.
5). The filling valve structure design is reasonable, the filling quantity is accurate.
Capping part:
The capping machine is the highest precision in 3-in-1 unit machine, on the reliability of equipment operation, has enormous influence on the defective rate of the product.
Introduced the world's most advanced Italian AROL capping machine technology, combining with the filling machine production experience improvement, and ask college of Shanghai Jiaotong university mechanical engineering institute of electrical and mechanical design and automation technology of experts and professors to help design.
Technical Parameter
Model | RGFC | RGFC | RGFC | RGFC | RGFC | RGFC | RGFC | RGFC |
16/12/6 | 18/18/6 | 24/24/8 | 32/32/10 | 40/40/12 | 50/50/15 | 60/60/15 | 72/72/18 | |
Rinsing Head | 16 | 18 | 24 | 32 | 40 | 50 | 60 | 72 |
Filling Head | 12 | 18 | 24 | 32 | 40 | 50 | 60 | 72 |
Capping Head | 6 | 6 | 8 | 10 | 12 | 15 | 15 | 18 |
Capacity (500ml) | 2000BPH | 8000BPH | 12000BPH | 15000BPH | 18000BPH | 21000BPH | 24000BPH | 27000BPH |
Pressure of air source | 0.7Mpa | 0.7Mpa | 0.7Mpa | 0.7Mpa | 0.7Mpa | 0.7Mpa | 0.7Mpa | 0.7Mpa |
Air consumption | 0.25M3/min | 0.8M3/min | 0.8M3/min | 0.8M3/min | 0.8M3/min | 1M3/min | 1M3/min | 1.2M3/min |
Pressure of rinse water | 0.2~0.25 | 0.2~0.25 | 0.2~0.25 | 0.2~0.25 | 0.2~0.25 | 0.2~0.25 | 0.2~0.25 | 0.2~0.25 |
MPa | MPa | MPa | MPa | MPa | MPa | MPa | MPa | |
Consump- | 1t/hour | 1.2t/hour | 1.2t/hour | 2t/hour | 2t/hour | 3t/hour | 4t/hour | 5t/hour |
tion of rinsing | ||||||||
water | ||||||||
Filling Pressure | 0.2-0.3Mpa | |||||||
Suitable bottle size | 300ml-1500ml | 300ml-1500ml | 300ml-2000ml | 300ml-2000ml | 300ml-2500ml | 300ml-2500ml | 300ml-2500ml | 300ml-2500ml |
D:50-90mm | D:50-90mm | D:50-115mm | D:50-115mm | D:50-120mm | D:50-120mm | D:50-120mm | D:50-120mm | |
H:150-320mm | H:150-320mm | H:150-320mm | H:150-320mm | H:150-320mm | H:150-320mm | H:150-320mm | H:150-320mm | |
Power | 2.5KW | 3.5KW | 4.5KW | 5.6KW | 6.3KW | 7.5KW | 11KW | 15KW |
Weight | 2500KG | 3000KG | 4000KG | 5000KG | 6000KG | 7500KG | 8500KG | 10000KG |
Packing Size | 2200×1800 | 2300×2000 | 3000×2200 | 4000×2600 | 4700×2950 | 5100×4800 | 6200×4950 | 7000×5500 |
(L*W*H)(mm) | ×2300 | ×2300 | ×2800 | ×2800 | ×2800 | ×3000 | ×3000 | ×3000 |
Flow Chart:
A. PET Preforms →Heat preform → Stretch → Blowing → Bottles
B. Stainless steel multistage centrifugal Pump→ Multiple medium filter→ Active carbon filter→Sodium exchange→ Micro filter→ Reverse osmosis→ Ozone generator→ Water tank→ Water Pump
C. Air conveyor→ 3-in-1 Bottle water filling machine→Lamp checker→ Conveyor→ Dryer→Labeling machine→ Ink jet code printer→ Shrink packing machine→ Stock
Packing and Shipping
Certificate
FAQ
Q: How about the spare parts?
A: We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.
Q: How long time for installation?
A: According your machines order, we will send one or two engineers to your plant, it will take about 10 days to 25 days.
Q: How to install my machines when it arrives? How much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back accommodation and USD80/day/person.
Q: When can I get my machine after I paid?
A: Normally production time is around 30-60days, the exactly depend on what kind of machine you order. The shipping time is based on your destination port.
Q: What`s your guarantee or warranty of the quality if buy your machines?
A: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q: Are you a trading company or a manufacturer?
A:We are an original equipment manufacturer so that we can provide you high quality machines in reasonable price. Welcome to visit us.
Related Keywords