
1200BPH 3L-10L Bottle Mineral Water Filling Line Machine
- Payment Type:
- L/C, T/T
- Incoterm:
- FOB, CFR, CIF
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 30 Days
- Transportation:
- Ocean
- Port:
- Shanghai Port
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | Zhangjiagang City |
---|---|
Productivity: | 2000BPH |
Supply Ability: | 20Sets/Month |
Payment Type: | L/C,T/T |
Incoterm: | FOB,CFR,CIF |
Certificate: | ISO9001, CE |
HS Code: | 8422309090 |
Transportation: | Ocean |
Port: | Shanghai Port |
1200BPH 3L-10L Bottle Mineral Water Filling Machine
Description
This bottle water filling machine is mainly used for liquid (water, wine etc.) filling, which concentrates disinfection rinsing, filling, capping together, which features of moderate production capacity, simple structure, and easy operation. water bottle filling machine is a good option for the bottled drinking water factory.
This small bottle filling machine is comprised of rinsing, filling and capping system. All the machine part which contact with liquid is high quality stainless steel 304. The relative fittings are from international famous brand.
Water distributor combined with food grade rubber plate & SUS304 cover. Spraying inject design, can washing the bottles completely.
The entire filler is gravity filling system. High accurate SUS304L construction filling nozzle, make sure high accurate filling level
Filling level is adjustable by choosing different silicone gasket (quick change over parts), no bottles, no filling.
The liquid bowl with automatic water level controller
Automatic caps arranging, feeding, no bottle no caps delivery.
PLC control, touch screen control panel
Technical Parameter of Filling and Sealing Machine
Production Capacity(B/H) | 500-5000(B/H) |
Filling Volume | 3L-10L |
Bottle Material | All shapes of HDPE, PP, PET Plastic bottles |
Filling Precision | ±2% |
Gas Source Pressure | 0.6-0.8MPa |
Air Consumption | 50L/Min |
Washing Water Consumption | 0.8M3/H |
Picture
Factory Show
Packing and Shipping
Certificate
FAQ
Q: How about the spare parts?
A: We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.
Q: How long time for installation?
A: According your machines order, we will send one or two engineers to your plant, it will take about 10 days to 25 days.
Q: How to install my machines when it arrives? How much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back accommodation and USD80/day/person.
Q: When can I get my machine after I paid?
A: Normally production time is around 30-60days, the exactly depend on what kind of machine you order. The shipping time is based on your destination port.
Q: What`s your guarantee or warranty of the quality if buy your machines?
A: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q: Are you a trading company or a manufacturer?
A:We are an original equipment manufacturer so that we can provide you high quality machines in reasonable price. Welcome to visit us.
Related Keywords