Basic Info
Basic Info
Place of Origin: Jiangsu Suzhou
Payment Type: L/C, T/T, D/P, Western Union
Product Description
Product Description

Brief introduction:

750cc Juice Bottle  1440 min/day 60 unit/min  73.500 bottle/day ( 85%accepting ratio)
Jar(720cc)330g        1440min/day 130 unit/min 160.000 jar/day    (85% accepting ratio)
Jar( 156cc)147g       1440min/day 180 unit/min 220.000 jar/day    (85% accepting ratio)

1. Main technical data
1.1  Raw material  preparation:             automatic batch plant 
1.2  Capacity:                                       120ton/day 
1.3  Work shift:                                      two  shift per day 
1.4  Storage:                                         two days          
1.5  Control  of  batch pl ant:                 central computer control 
1.6  Arrangement:                                  liner arrange 
1.7  Furnace:                                         regenerative end-fired type 
1.8  Mel ting capacity:                            120ton/day liquid glass 
1.9  Mel ting rate:                                   2.0 
1.10  Kind of glass:                                soda-line glass 
1.11  Color:                                            flint 
1.12  Fuel:                                              diesel  oil 
1.13  Raw materials:                               silica sand; feldspar; dolomite; soda ash; cullet 
1.14  Cullet rate:                                     30-70%
1.15  Products:                                       750cc juice bottle/720cc j ar/156cc  jar 
1.16  Production line:                              3 sets
1.17  Forhearth doubl e stirrer:               3-section aut o control  and adjust ing, equipped with
double stirrer 
1.18  Forming equipment:                        3 sets of 6-section doubl e gob I.S machi ne 
1.18.1  Electronic timing
1.18.2  Auto synchronize system
1.18.3  Servo distribution
1.18.4  Servotake-out 

1.18.5  Servo invert
1.18.6  Electronic pushing
1.19  Anneal ing lehr                               3 set  of auto control  l ehr 
1.20  Workers:                                        100  workers  and  technicians  for  the  whole  factory ,  three  shift  per  day  (Including operator, el ectrician, mechanics, etc)
2.21  Land requirement: 
Total f actory area:                                 20,000sqm 
Workshop for production line:    
Length: 120m
Width: 25m
Height: 12-15m (f urnace area) 
8-12m (production area)

Pictures of factory:
 



 No.
  Description
 1  Raw material preparation plant
 2  Furnace refractory  and equipment
 3  Production l ine  equipment
 4  Design & technol ogy documents
 5  Supervision