
Glass Production Line (Plant) Turnkey Project
- Payment Type:
- L/C, T/T, D/P, Western Union
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Place of Origin: | Jiangsu Suzhou |
---|---|
Payment Type: | L/C, T/T, D/P, Western Union |
Product Description
Product Description
I. Main technical parameter:
1. Melt ability on the 1st: 40t/d
Fold into glass thickness is 5 mm, Daily output is 2600 m2
2. Product varieties: Colourless transparent glass;
3. Product specifications: Thickness range 2- 10mm;
4. The width of original board of glass: 2400mm;
5. Product quality: Accord with the national standard in the People's Republic of China;
6. Comprehensive yield: 80%
7. Unit utilization ratios: 97.5%
8. Melts the life-span of the kiln: 4
1. Raw materials (The qualified powder material enters the factory)
1.1 Conditions of quality of different raw materials
Note: The accurate requirement of different raw materials should be decided after the quality of the raw material is confirmed.
2. Fuel: Natural gas:
3. Supply power:
3.1 Demands consist of two pieces of independent power, so as to ensure that supplies power incessantly.
3.2 That enters factory's voltage:10KV±5%, frequency 50Hz± 1%, supplies power steadily in succession.
3.3 Supply power in workshop:
Voltage 380V/220V±10%, frequency 50Hz.
3.4 The installed capacity of factories of equipment invites :100KVA;
Calculate load in normal production: <60kwh.
4. Pictures


1. Melt ability on the 1st: 40t/d
Fold into glass thickness is 5 mm, Daily output is 2600 m2
2. Product varieties: Colourless transparent glass;
3. Product specifications: Thickness range 2- 10mm;
4. The width of original board of glass: 2400mm;
5. Product quality: Accord with the national standard in the People's Republic of China;
6. Comprehensive yield: 80%
7. Unit utilization ratios: 97.5%
8. Melts the life-span of the kiln: 4
1. Raw materials (The qualified powder material enters the factory)
1.1 Conditions of quality of different raw materials

2. Fuel: Natural gas:
3. Supply power:
3.1 Demands consist of two pieces of independent power, so as to ensure that supplies power incessantly.
3.2 That enters factory's voltage:10KV±5%, frequency 50Hz± 1%, supplies power steadily in succession.
3.3 Supply power in workshop:
Voltage 380V/220V±10%, frequency 50Hz.
3.4 The installed capacity of factories of equipment invites :100KVA;
Calculate load in normal production: <60kwh.
4. Pictures


SN. | Project |
1 | Raw materials workshop |
2 | Production unites the workshop |
2.1 | Melt the section |
2.2 | Shaping section |
2.3 | Section that anneal |
2.4 | Cut and judge the section of the finished product |
2.5 | Bits of broken glass system |
3 | Affiliated facility |
3.1 | Compress the air and stand |
3.2 | Circulating water system |
3.3 | Laboratory |
4 | Support the distribution system |
5 | System ofNatural gas |
6 | Installation and cold adjustment (cold adjustment is about 120days) |
Related Keywords
Related Keywords
You May Also Like
You May Also Like