SUZHOU CMT IMP&EXP CO., LTD.
SUZHOU CMT IMP&EXP CO., LTD.
Motorcycle/Bike Production Line
  • Motorcycle/Bike Production Line
Motorcycle/Bike Production Line

Motorcycle/Bike Production Line

Payment Type:
L/C, T/T, D/P, Western Union
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Jiangsu Suzhou
Payment Type: L/C, T/T, D/P, Western Union
Product Description
Product Description
Motorcycle/Bike Production LineMotorcycle/Bike Production Line
The motorcycle production line is consist of three main parts: assembly line, testing line and package line .

1. Process for assembly
1.1 For motorcycle assembly
No. Item
01 Frame Marking
 
02 Press axle
 
03 Connect cable, fix cushion and lacing wire
 
04 Install rear wheel fork combination ,rear brake connection
 
05 Install filter
 
06 Ignition coil
 
07 Install front of rear fender , voltage regulator line, starting relay, flasher
 
08 Front fork suspension and front sign bracket combination ,Head lock combination ,connection board combination on instrument , flexible axle
 
09 Install front fender, front fender lining, front license plate bracket
 
10 Install rear of rear fender ,rear license plate bracket, rear taillight, rear label, rear reflector
 
11 Install rear of rear fender, rear turn light bracket ,rear turn light
 
12 Install main bracket ,rear brake arm combination
13 Install front wheel , rear wheel split pin
 
14 Install light ,fairing, windshield
 
15 Install Hand assembly
 
16 Install left & right front fork, front turn light, side reflector
 
17 Install carburetor, wiring
 

1.2For engine assembly
No Item
01 Engine Assembly
 
02 Engine assembly frame ,rear break pull rod
 
03 Tighten carburetor
 
04 Install front wheel combination
 
05 Install rear wheel rear fork combination
 
06 Adjust chain, tighten rear wheel
 
07 Adjust rear brake
 
08 Tighten rear shock, instrument combination and front fork
 
09 Tighten left & right of rear paddle combination
 
10 Tighten silencer
 
11 Wiring
 
12 Install chain case
 
12 Install handlebar
 
13 Install starting arm
 
14 Install throttle cable
 
15 Install front light combination
 
16 Engine right & left cover, gear shift pedal
 
17 Tighten top of rear shock absorption
 
18 Tighten fuel tank
 
19 Tighten accumulator box
 
20 Frame rubber gasket, left & right body cover
 
21 Tighten rear central cover
 
22 Tighten left & right side cover
 
23 Tighten rear storage rack
 
24 Install cushion and fuel tank lock
 


2.  Production line list
No. Name Quantity Note
1 (1) Assembly line Line 1 set 1 pcs 45m
(2) Drive and control 1 pcs
(3) Jig 36 pcs
(4) Turn-line hoist(250KGS) 1 pcs
(5) Pre assembly work table 1 pcs
2
 
Testing line 1 set
3
 
Package line 1 set 15m
4 (1) Public facility Air compressor 1 set 1 pcs
(2) Air tank 1 pcs
(3) Filter 1 pcs
(4) Marking machine 1 pcs
(5) Tyre machine 1 pcs
5 (1) Pneumatic tools Gas driving spanner 1 set WT985
(2) Pneumatic screwdrive WT203
(3) Spring balancer
(4) Air charging gun
(5) Sprial air pipe 8×12×7.5M
(6) Pneumatic screwdrive(Gun type) WT208
(7) Gas driving spanner WT906
(8) Torque spanner
(9) Digital multimeter
(10) Vernier caliper
(11) Electric hand drill 13RE
(12) T-Sleeve 8-19
(13) Tool bit QT-L
(14) Sleeve 1/2
(15) Internal hexagonal wrench

For more information, please contact us at any time.

Send your message to this supplier

  • Ms. Elisa

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords