SUZHOU CMT IMP&EXP CO., LTD.
SUZHOU CMT IMP&EXP CO., LTD.
SGS Waste Tires Recycling Production (Pyrolysis) Turnkey Project
  • SGS Waste Tires Recycling Production (Pyrolysis) Turnkey Project
SGS Waste Tires Recycling Production (Pyrolysis) Turnkey Project

SGS Waste Tires Recycling Production (Pyrolysis) Turnkey Project

Payment Type:
L/C, T/T, D/P, Western Union
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Jiangsu Suzhou
Payment Type: L/C, T/T, D/P, Western Union
Product Description
Product Description


SGS Waste Tires Recycling Production (Pyrolysis) Turnkey Project


The Machine List:
1)Rotatable reactor:Q245R  Boiler plate:2200mm*6000mm  14mm
2)Machine cover:4 pieces
3)Main machine base
4)Oil separator:1000mm*1800mm  8mm
5)Catalyst tower:325mm*1500mm*12mm
6)Cooling system(either is ok)
    Vertical condensers:2 setting tanks & 2 sets 1000mm*3500mm condensers
    Coil cooling system:3 setting tanks and 22 pipes 108mm
7)Light oil tank:1200mm*3500mm  5mm

8)Heavy oil tank:800*1800mm  5mm
9)Water sealing tank:1000*1500mm  5mm
10)Cooling tower:50MT/HOUR
11)Induced draft fan(Chinese standard ):4KW
12)Speed reducer(Chinese standard ):3KW
13)Dust remove system:1000mm*4500mm  5mm
14)Flue condenser
15)Waste gas burners:4 sets
16)Blowers:4sets
17)Electric cabinet
18)The pressure automatic alarm
19)Water pump:1.5KW
20)Oil pump :1.5KW
21)  Chimney:273mm*6000mm 
22)  Automatic slag discharge system
23)  Take steel wire out automatic machine
24)Tyre cut machine
25)  Conveyor belt

26)  Auto feeder


Factory needed area:

All equipments Needed around 300m2, Length: 22m, Width: 14m, Height: 5-6m; Excluding raw material area.   The workshop can be simple shed.


Payment terms:

First pay 30% T/T as the advance payment;
Seconded pay 70% T/T before delivery from our manufactory;
Lead time: After advance payment 25days.

Packing: 2 units of 40'HQ.


Note:
1. The seller sends the foundation drawings to the buyer after make the order and advance payment.
2. The seller send engineer to buyer when machine reach buyer's factory. The engineers do the installation, and then guiding and training the buyer's workers operate and repair the equipment. The buyer should be responsible for each of our technician's accommodation, meals, round-trip tickets, self-security and USD 80 per day abroad.
3. The seller Telefax the BL, packing list and certificate of origin to buyer after delivery machine.
4. Guarantee terms: We guarantee the complete machine two years. Normally, the reactor can be used for
more than 4 years. Other parts no need be changed lifelong time expect the wearing parts.


 
Raw material Waste tire , Waste rubber, Waste plastic
Oil yield/day Waste tire/rubber Big tyres  45%-50%
Car tyres  40%
Bicycles and motorcycles tyres 30%-35%
Waste Plastic
 
Fishing net ,
safety net, farm-oriented film
45%-50%
Convenient bags, weave bags 40%
Off-cut of recycled paper mill 20%-30%
PE 70%
PVC 45 – 50%
PP 30%
Structural Form Horizontal
Capacity/day 3 batches/ 2 days
Raw material 245R Boiler Steel plate
Operating pressure Normal pressure
Power Coal, wood, natural gas or fuel oil
Mode of cooling Water-cooling
Working form Intermittent
24 hour disposal amount 5 tons of raw material
24 hour oil yield Depends on oil output rate
Rotate speed of main equipment 0.4 turn / m
Power in total 11 KW / hour
Heating mode Direct heating
Noised B ( A ) ≤85

Send your message to this supplier

  • Ms. Elisa

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords