Zhangjiagang JST Machinery Co., Ltd.
Zhangjiagang JST Machinery Co., Ltd.
Full Automatic Sewage Treatment Machine for Industrial Sewage Treatment Machine for Industrial Wastewater
  • Full Automatic Sewage Treatment Machine for Industrial Sewage Treatment Machine for Industrial Wastewater
Full Automatic Sewage Treatment Machine for Industrial Sewage Treatment Machine for Industrial Wastewater

Full Automatic Sewage Treatment Machine for Industrial Sewage Treatment Machine for Industrial Wastewater

Payment Type:
L/C, T/T, Paypal, Western Union
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Made in China
Payment Type: L/C, T/T, Paypal, Western Union
Product Description
Product Description
1. Sewage treatment machine for industrial wastewater description:
1). Sludge dewatering equipment 202S
2). DS standard capacity: 18kg/h --30kg/h
3). No secondary pollution
4). Operation costs can be saved
Full automatic sewage treatment machine for industrial wastewater which uses the screw extrusion principle is a new type of solid-liquid separation device. It reaches the goal of extrusion dewatering sludge by the powerful extrusion pressure of changing the screw diameter and distance, and the tiny spacing between moveable annular plates and fixed annular plates.
2. Structure Principle:
The main body of Full automatic sewage treatment machine for industrial wastewater is made of multiple fixed annular plates and moveable annular plates with the screw shaft running through it. The front part is thickening department and the ending part is dewatering department. It can thicken and dewater sludge in one box, and has taken place of the traditional filter clothes and centrifugal filtration method for its distinctive filter model.

3. Dewatering theory:
Sludge will be transported to the dewatering department after being thickened in the thickening department. In the advancing process, great pressure has been produced because of the gradually decreasing filter spacing and screw distance, and the back platen clogging. Then the volume decreases continuously, and the purpose of fully dewatering will be achieved.
4. Process Flow Diagram:

Send your message to this supplier

  • Ms. Lisa

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords