Zhangjiagang JST Machinery Co., Ltd.
Zhangjiagang JST Machinery Co., Ltd.
Glass Bottle1-3 Gallon Pure Water Packaging Machine / Equipment / Factory
  • Glass Bottle1-3 Gallon Pure Water Packaging Machine / Equipment / Factory
Glass Bottle1-3 Gallon Pure Water Packaging Machine / Equipment / Factory

Glass Bottle1-3 Gallon Pure Water Packaging Machine / Equipment / Factory

Payment Type:
L/C, T/T, Western Union
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Zhangjiagang City, Jiangsu Province, China
Payment Type: L/C, T/T, Western Union
Product Description
Product Description
1 - 3 gallon glass bottle pure water packaging machine / equipment / factory
Big glass bottle water packaging machine description
Main components of water 1 - 3 gallon bottle packaging factory:
1) driving system;
2) bottle-loading system;
3) bottle-filling machine
4) filling system;
5) star wheel system between filling and capping;
6) frame;
7) electrical system.
8)Pure water packaging factory also suitable for table water, still water, mineral water and so on.
Rotary type 1 - 3 gallon glass bottle packaging machine:
1) model: CGF-16D
2) name: Filling machine for 1 gallon glass bottle packaging or 3 gallon water glass bottle packaging
3) Filling heads: 16
Capping heads: 6
4) capacity: 1500bottle per hour (for 5000ml bottle)
5) dimension: 4500mm (length)*2050mm (width)* 2200mm (height)
6) suitable bottle: Glass bottle (sample provided by customer)
7) suitable cap: Plastic anti-theft
8) frequency converter: Mitsubishi
9) main motor: 5.5kw
10) rinsing water pressure: 0.06 mpa < P ≤ 0.2 mpa
11) weight: 5000kgs
Pure water glass bottle packaging machine-Filler
Water glass bottle packaging equipment design of filling structure is reasonable and hygiene dead angle, the run of equipment is stable, it can control the material from the bottleneck, the control accuracy is within ± 2mm (subject to bottle design). Pure water glass bottle machine filling valve material is SUS304. The filling system has liquid level automatic control. Filling valve lift is controlled by the valve elevator, after filling valve contact the bottleneck, it starts to fill. Bottle is conveying by the wheel in the filling part.
Our service for 1 - 3 gallon glass bottle water factory:
We will send one professional engineer to install the whole water packaging equipment for you, but you should pay him USD 60 / DAY as salary, also include his return tickets, room, food and visa fee.
Machine guarantee time: 12 months
How to get your suitable water packaging equipment or production line?
Enquiry: Contact us by email, phone call, fax, Instant Messenger and let us know your enquiry.
Discussion: Specify the items you desire, confirm specification
Quotation: Prices offered and accepted.
Place order as per contract or discussion.
Perform invoice( sales contract ) In duplicate confirmed and kept by both sides.
Payment settled.
Order completed under our arrangement.
Goods shipped as per contracted term.
Goods arrive at local port or warehouse, depending on contracted term.

Send your message to this supplier

  • Ms. Lisa

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords