Zhangjiagang JST Machinery Co., Ltd.
Zhangjiagang JST Machinery Co., Ltd.
Mineral Water Production Plant Rotary Three in One Plastic Bottled
  • Mineral Water Production Plant Rotary Three in One Plastic Bottled
Mineral Water Production Plant Rotary Three in One Plastic Bottled

Mineral Water Production Plant Rotary Three in One Plastic Bottled

Payment Type:
L/C, T/T, Paypal, Western Union
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Zhangjiagang City, Jiangsu Province, China
Payment Type: L/C, T/T, Paypal, Western Union
Product Description
Product Description
Plastic Bottled Automatic three in one Rotary Mineral Water Production Plant
Water production plant Description
CGF series three in one mineral water production plant is a kind of professional Plastic Bottled Automatic three in one Rotary Mineral Water Production Plant integrator for no-gassy beverage. Water production plant is multifunctional which can be used for washing, filling and capping. It is a kind of advanced mineral water production plant integrator which is innovated in following the process requirements of filling Pure water, Mineral water, wine and etc based on the importing and assimilating the foreign advanced technology.
Water production plant Rinser
Spring cramps are used in the bottle washing process. The empty bottles can be turned over 180° Along the conveying rail. There are two times of internal and external washing, the efficiency of bottle washing is high.
Rinsing machine adopts JST original overturn and double-opened bottle clip. Bottle clip lock the bottleneck, the material of bottle clip is SUS304, which is hygienic and durable.
Bottle clip equipped with efficient spray on nozzle. The extrusive droplet with 15° Angleensures to wash all side of the bottle, and can save the water.
Water production plant Filler
Mineral water production plant is designed of filling structure is reasonable and hygiene dead angle, the run of equipment is stable, it can control the material from the bottleneck, the control accuracy is within ± 2mm (subject to bottle design). The filling valve material is SUS304. The filling system has liquid level automatic control. Filling valve lift is controlled by the valve elevator, after filling valve contact the bottleneck, it starts to fill. Bottle is conveying by the wheel in the filling part.
Water production plant Capper
Screw capping machine is most precision part in the 3-1 machine, it has a big influence to the goods stability and defective rate. Our screw capping has following feature.
1)JST import of advanced technology of screw capping, improve the stability and reliability of the screw capping machine. The magnetic torque is used for screw capping. Thepower of screw capping can be adjusted without steps. The power of the screw capping can also be fixed, and the caps will not be damaged, the capping is reliable.
2) In the screw capping part. It installed photoelectrical control, when it has no cap, or the cap is bad, the machine will stop automatically.
Machine after-sales service:
We will send one professional engineer to install the whole line for you, but you should pay him USD 60 / DAY as salary, also include his return tickets, room, food and visa fee.
Machine guarantee time: 12 months
FAQ for machines
1. What kind of products will you produce?
2. What is the capacity(per hour) you want?
3. What kind of package, plastic bottle, glass bottle: Volume, height, neck diameter, diameter of bottle or other please inform us of details.
4. Sole machine or whole production line

Send your message to this supplier

  • Ms. Lisa

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords