Zhangjiagang Yoho Machinery Equipment Co., Ltd.
Zhangjiagang Yoho Machinery Equipment Co., Ltd.
CE He-50A Pipe End Forming Machine
  • CE He-50A Pipe End Forming Machine
CE He-50A Pipe End Forming Machine

CE He-50A Pipe End Forming Machine

Payment Type:
L/C, T/T
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Zhangjiagang, Jiangsu
Payment Type: L/C, T/T
Product Description
Product Description
CE HE-50A Pipe End Forming Machine1) NC Control Unit: Easy Operation and Maintenance2) Suitable for the shrinking of various metal pipes with different material and different shape3) Equipped with emergency stop device. Both manual and automatic operations are available4) Forming shapes can be convex, concave, sectional, long 7 flat, square, V-shaped, open elbow and flat elbow. The design of the tooling varies with workpiece and customers' requirements pipe end shaping machine. Quality guarantee: (1) Factory guarantees machinery well packed and testing qualified before shipment. (2) Factory guarantees all the goods are brand-new; No defects for the specifications or materials used. Twelve months quality warranty after Customer accepts the inspection for machinery's trial operation. ClaimsCustomer has rights to claims if there is quality problem caused by deficient manufacturing procedure, material or technical parameter, which doesn't match the contract specified, factory will take responsibility for all related expenses caused. Penalty1, if contractual delivery day postponed due to factory's reason except force-majeure, Customer has rights to get the compensation by portion from factory based on the followings: (1) factory has ten days grace period(2) Starting from the eleven days after delivery day postponed, every day's penalty for factory is the whole contract amount's 0.1%. 2, if contractual payment day postponed due to Part A's reason except force-majeure, factory has rights to get the compensation by portion from Customer based on the followings: (1) Customer has ten days grace period(2) Starting from the eleven days after payment day postponed, every day's penalty for Customer is the whole contract amount's 0.1%. 3, the above mentioned penalty total amount can not be exceeding the whole contract amount's 5%. Force Majeure: We factory shall not be held responsible for late delivery of the goods owing to generally recognized Force Majerue. Factory should notice Customer by oral immediately. 15 days later after force Majerue happens, and post customer the written proof documents from the related departments. If force manjerue keeps more than 60 days, Customer can cancel the contract. Factory should return the payment. Technical materials provide: Factory should provide the following dataEach of Chinese / English version manual and matching tools enclosed for one machine. Contract amendmentAny changes for the contract clauses, a written contract amendment must be signed by both parties. ArbitrationIf there is dispute during contract implementation, we should settle through negotiation made in the principle of fair cooperation. If not, the case under dispute shall be submitted for arbitration. Which has the same equally binding to both Parties, The cost of arbitration shall be borne by the losing party. During the arbitration, the non-dispute portion of the contract continues to implement except the arbitration part.

Send your message to this supplier

  • Mr. Anker

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords